Wappingers School District, NY

Project Size: $8.8 Million
Cash Flow: $2.6 Million
Total Value: $11.4 Million
Completed: December 2013
Project Description:
Energy Performance Contract

.................................................
Annual Energy Savings: $515,241
Reduction in Energy Costs: 26.0%

.................................................

Project Description
Although Wappingers School District had already contracted with a company that aimed to reduce energy costs through modifying human behavior, the District knew that many of its systems were energy inefficient and should be updated. In addition, the District had numerous, serious capital needs that had to be addressed, and during a time when asking the public to consider a bond was not a viable option. As a response, the District turned to ECG Engineering to help it initiate a no cost, no risk Energy Performance Contract. The result was a project fully funded by energy savings that will bring over $11 million worth of needed capital improvements to the District.

Project Highlights

  • lighting upgrades and controls, occupancy sensors
  • exterior light improvement
  • energy management system
  • high efficiency/variable frequency drives
  • computer power management
  • weatherization
  • boiler replacement
  • steam trap replace
  • walk-in freezer controllers
  • pipe insulation
  • vending machine controls
  • premium efficiency motors
  • destratification fans