THE ECG GROUP: PROJECTS
Scarsdale School District, NY

Project Size: $7.5 Million
Cash Flow: $430,000
Total Value: $8 Million
Completed: April 2010
Project Description:
Energy Performance Contract

.................................................
Annual Energy Savings: $409,283
Reduction in Energy Costs: 27.0%

.................................................

Project Description
After a thorough inspection of Scarsdale UFSD’s facilities as part of the Building Condition Survey process, ECG’s engineers noted that the district had several systems that could be upgraded through an Energy Performance Contract (EPC).

ECG was subsequently retained to assist the district through the EPC RFP process. The result was $7.5 million worth of capital upgrades that will be implemented without taxpayer impact.

Project Highlights

  • lighting system upgrades
  • occupancy sensors
  • integrated building energy management system
  • boiler controllers
  • steam trap replacement
  • thermostatic radiator valve installation
  • transformer replacement
  • window/door replacements
  • heat-rejecting window film
  • vending machine controls
  • kitchen exhaust hood controls
  • insulate pipe and valve insulation
  • weatherization
  • solar photovoltaic (pv) systems
  • kitchen hot water control valves
  • computer power management
  • attic insulation
Back to Portfolio Page