THE ECG GROUP: PROJECTS
Plainedge School District, NY

Project Size: $6.3 Million
Cash Flow: $3.0 Million
Total Value: $9.3 Million
Completion Date: November 2016
Project Description:
Energy Performance Contract

.................................................
Annual Energy Savings: $339,156
Reduction in Energy Costs: 41.0%

.................................................

Project Description
With a mounting list of facility needs identified in its Five Year Capital Facilities Plan, Administrators at the Plainedge School District recognized EPC as a way to accomplish priority projects without raising taxes during a weak economy. ECG was retained to manage the EPC process. The result was an EPC that will implement over $6 million in upgrades district-wide, including a Chiller upgrade at the Middle School.

Project Highlights

  • Lighting upgrades
  • Lighting controls/Occupancy Sensors
  • Energy Management System
  • Computer Power Management
  • Building Envelope Improvements
  • Kitchen Hood Controls
  • Boiler Replacement
  • Boiler Controls
  • Air Conditioning Compressor Controller
  • Variable Frequency Drives
  • Unit Ventilators Refurbishment
  • Mini-Split System and RTU Replacement
  • Pipe and Duct Insulation
  • Water Conservation
  • Fuel Catalyzer
  • Solar Photovoltaic System
  • Walk-In Cooler Controls
  • Premium Efficiency Motors
  • Energy Efficiency Transformers
  • Energy Bank
  • MS Chiller System Upgrade
  • Window Film
  • Vending Misers
Back to Portfolio Page