THE ECG GROUP: PROJECTS
Northport- East Northport School District, NY

Project Size: $13.1 Million
Cash Flow: $3.7 Million
Total Value: $16.8 Million
Completion Date: September 2017
Project Description:
Energy Performance Contract

.................................................
Annual Energy Savings: $651,552
Reduction in Energy Costs: 33%

.................................................

Project Description
The EPC at Northport-East Northport UFSD was initiated to ensure the district was operating efficiently district-wide. One of the highlights of the project was the replacement of ceilings throughout all of the High School common areas and corridors. The replacement of these ceilings would normally cost the district tens of thousands of dollars. The EPC will accomplish this needed upgrade without any out-of-pocket cost to the district.

Project Highlights

  • Lighting upgrades
  • Lighting controls/Occupancy Sensors
  • Exterior Lighting
  • Energy Management System
  • Steam Trap Replacement
  • Computer Power Management
  • Building Envelope Improvements
  • Kitchen Hood Controls
  • Unit Ventilators Refurbishment
  • Boiler and Burner Controls
  • Domestic Hot Water Heater
  • Ceiling Replacement
  • Boiler/Burner Replacement
  • Air Conditioner Unit Upgrade
  • Fuel Catalyzers
  • Pipe and Valve Insulation
  • Water Conservation
  • Solar Photovoltaic System
  • Window Film
  • Refrigeration Controls
  • Vending Machine Controllers
  • Transformer Replacement