ECG ENGINEERING: PROJECTS
Monroe-Woodbury School District, NY

Project Size: $12 Million
Cash Flow: $4 Million
Total Value: $16 Million
Completed: July 2011
Project Description:
Energy Performance Contract

.................................................
Annual Energy Savings: $686,824
Reduction in Energy Costs: 29%

.................................................

Project Description
Mr. Willliam Blosser, an officer of the New York State Association for Superintendents of School Buildings and Grounds, was aware of the Energy Performance Engineering Services offered by ECG and asked us to submit a proposal to manage the District’s Energy Project. As a result, ECG prepared a District-specific RFP and solicited five highly competitive proposals. The end result was a larger project tailored to the District’s specific needs that included $12.1 million in capital improvements including: large capital projects related to the installation of windows and unit ventilators.

UPDATE: ECG is currently in discussion with the District to initiate a Phase 2 opportunity.

Project Highlights

  • lighting system upgrades/occupancy sensors
  • weatherization
  • energy management system upgrades
  • demand-controlled ventilation
  • insulate steam hotwater pipe and valves
  • unit ventilator refurb./replacements
  • rooftop air handler replacement
  • chiller replacement
  • kitchen hood exhaust controls
  • convert const. volume to variable volume air handler unit
  • swimming pool cover
  • natatorium dehumidifier
  • boiler/burner replacement
  • boiler controllers
  • domestic hot water heater
  • control valves for unit vents
  • refrig./freezer controllers
  • dishwasher booster heaters
  • transformer replacement
  • window film
  • window replacements
  • vending machine controls
  • photovoltaic (solar) panels
  • computer power mgmt/monitor replacement
  • kitchen hot water foot pedals 

 

Back to Portfolio Page