THE ECG GROUP: PROJECTS
Middle Country School District, NY

Project Size: $13.6 Million
Cash Flow: $8.0 Million
Total Value: $21.6 Million
Completed: July 2013
Project Description:
Energy Performance Contract

.................................................
Annual Energy Savings: $745,795
Reduction in Energy Costs: 25%

.................................................

Project Description
The magnitude of Middle Country’s EPC opportunity is one of many examples of how districts, despite performing major bond issues and maintaining their buildings well, can reap extraordinary benefits through the EPC process.  Middle Country CSD will deliver, with the state building aid their EPC project will receive, over $19 million of value to their taxpayers at no cost. Instead of wasting energy, they will leverage that waste to engage in a construction project that will put people to work and greatly improve their facilities district-wide.

In addition, the district received a rebate check of $770,035, the largest rebate check ever awarded at that time to a district by the Long Island Power Authority (LIPA) for a single group of energy conservation projects as a result from the EPC initiated, designed and managed by ECG.

Update: ECG was recently retained to investigate a Phase II EPC at Middle Country School District.

Project Highlights

  • lighting system upgrades and controls
  • weatherization
  • energy management system upgrades
  • steam trap repair / replacement
  • window/door replacements
  • computer power management
  • vending machine controls
  • photovoltaic (solar) panels
  • cogeneration system
  • waste oil heater
  • boiler replacement
  • pipe, valve, fitting insulation
  • boiler controllers
  • window film
  • kitchen exhaust hood controls
  • energy efficient meters
  • kitchen sink pedal motor valves
  • side stream filters
  • transformer replacements
  • variable frequency drives on fans 