Energy Performance Contract

.................................................
Annual Energy Savings: $105,981
Reduction in Energy Costs: 27%

.................................................

Project Description
Although the energy savings opportunity was relatively small, the Board of Education at Hastings-on-Hudson UFSD saw the value that the Energy Performance Contract (EPC) process could bring to their district environmentally, financially, and educationally. One highlight of this EPC is the solar panels that it will bring to the district. Solar was a highly-desired measure that this green-minded community was eager to implement. With the EPC, the panels will be funded completely out of energy savings, and will provide a valuable educational experience for the students.

Project Highlights

  • lighting system upgrades
  • lighting controls - occupancy sensors
  • weatherization
  • energy management system upgrades
  • steam pipe and valve insulation
  • door replacements
  • computer power management
  • hot water foot pedals and flow restrictions
  • photovoltaic (solar) panels
  • boiler and burner controllers
  • attic insulation
  • air handler unit refurbishments
  • water conservation