Dover School District, NY

Project Size: $2.9 Million
Cash Flow: $1.6 Million
Total Value: $4.5 Million
Completed: June 2016
Project Description:
Energy Performance Contract

.................................................
Annual Energy Savings: $159,858
Reduction in Energy Costs: 31.0%

.................................................

Project Description
As financial pressures came to a head with the implementation of the tax cap in NY State, officials at Dover UFSD initiated an energy performance contract as a means to reduce costs and ensure energy efficiency. ECG Engineering was retained to prepare and issue an RFP, which yielded 5 proposals from Energy Services Companies. One of the highlights of the project will be the replacement of a large window wall that had previously been eliminated from several bond issues due to cost. These windows have since degraded significantly, and will be fully replaced and paid for out of guaranteed energy savings through the energy performance contract.

Project Highlights

  • lighting upgrades
  • lighting controls - occupancy sensors
  • external lighting
  • energy management system upgrades
  • computer power management
  • building envelope improvements
  • window replacement
  • boiler controls/burners
  • photovoltaic (solar) panels
  • destratification fans
  • electronic device management
  • energy efficient transformers
  • vending machine controllers
  • energy star appliances